Follow-up and development

Follow-up, development and risk management services

Periodic evaluation and continuous follow-up are the basis for the survival of projects. Their continuity depends on keeping up with everything new related to them, and on continuous development and complete readiness for any emergency or expected risks. That is why we at Chess pay special attention to this aspect and focus on it, as it is an essential section that is often forgotten in food projects.

Comprehensive examination and evaluation of food projects:

A service that enables the client to know the extent to which his food project conforms to local and international official standards and measures, and to know the strengths and weaknesses, and recommendations for treating them, by conducting a comprehensive analysis, study, and survey of all the project’s departments and sections, the most important of which are:

  1. Market analysis, especially comparison with competitors.
  2. Evaluate the idea and identity of the project.
  3. Legal Affairs Compliance.
  4. Financial performance analysis.
  5. Staff evaluation.
  6. Menu level evaluation.
  7. Check the production line.
  8. Quality assessment and customer service.
Request a quote

Project financial performance analysis:

This analysis reveals any mysterious errors in the project’s financial system, and shows the project’s economic feasibility and the level of security of the project’s financial situation through the following financial indicators:

  1. Liquidity Index: aims to determine the project’s ability to pay its short-term obligations (salaries, deferred suppliers, utility bills.../operating expenses).
  2. Financial efficiency indicators: aim to determine the efficiency of the facility in managing its assets, debts and inventory (the efficiency of money management).
  3. Investment Index: It aims to determine the most appropriate ratio of total debt to total capital, so that it remains under control.
  4. Profitability indicators: They help predict the time required to reach the break-even point and thus the amount of cash reserve required, as well as the reserve against loss and exiting with the least possible damage if it occurs.
  5. Report of findings and recommendations.


2300 riyals

Request service now

Job performance evaluation:

We help food establishments evaluate their staff through a program that was designed professionally and in accordance with the work system and scientific standards, to evaluate the project staff professionally and nominate the right person for the right place, discover talented people and care for them, discover any administrative laxity or transgression by officials using their powers inappropriately..., and submit a final detailed report on all of this with recommendations for dealing with each employee according to the evaluation results by promotion, qualification and training...



Request a quote

Menu engineering:

This item is the most important element in the project. Without a menu, the project with all its details, no matter how wonderful, is worthless and will not work. If the menu is not of a good standard and is not engineered according to standards, the project will remain stumbling. Therefore, this item must be taken seriously and this element, which is the soul of the project, must be generously treated. Without it, the project is dead. The danger lies in the fact that many projects stumble and lose, thinking that the menu is just a collection of items that only the chef has mastered, and they do not know that it is a science with international standards that consists of the following main stages:

  1. Screening items according to their economic feasibility according to the internationally known list engineering schedule for existing projects.
  2. Choosing the type of menu items appropriate for the project idea from the globally known types.
  3. Adopting items that are appropriate to the type of menu that has been selected and according to its own criteria.
  4. Documenting prescriptions electronically:

- In quantities

- And the method of preparation

- And the secret mixtures

- And calories

- The caffeine percentages for drinks are determined by the municipality.

- Allergens

- Validity, storage, packaging and presentation methods.

Request a quote

Food quality and safety inspection and evaluation:

This service is of utmost importance and is one of the pillars of the project’s success. Errors in it cause catastrophic damage, violations, fines, and official penalties, and affect reputation... It is done through:

via:

  1. Conducting a full inspection, survey and evaluation of all facility facilities, according to checklist schedules and regulations, in compliance with the requirements and standards of Ijada, the municipality and the global HACCP system, to ensure the facility’s compliance.
  2. Submit results report to project management.
  3. Taking corrective actions according to the results by preparing a special system suitable for the facility to monitor quality and food safety.
  4. Training the concerned staff on it.
  5. Support and follow-up for 3 months to ensure that the facility is able to use the system in the correct and effective manner.

(Compliance check can be requested separately)



Request a quote

Market Analysis:

Market analysis is very important for a new project, and it must be done periodically at least every 6 months, to know your position among your competitors, and analyze the segments you target to find a foothold in the market, and establish yourself in it, and develop your products according to the developments of competitors and the changing desires and interests of customers, and keep up with the new. This is done through:

  1. Geographic and demographic survey, in order to know the size of the competition by analyzing competitors.
  2. And the interests of the target segment, through customer analysis.


4025 SAR - Remote

Request service now

Establishing a fully fledged follow-up, development and risk management department:

Through a workshop to train the relevant staff in project management on:

  1. How to choose a distinctive project idea and its competitive advantages
  2. Market analysis mechanism
  3. How to prepare operational plans
  4. Mechanism for preparing a distinctive project identity strategy
  5. Ensure that all necessary legal matters for the project are in place.
  6. Mechanism for evaluating and analyzing the project’s periodic performance and developing development plans and risk management based on it.
Request a quote

Your monthly advisor service:

This service provides you with continuous assistance and support, consultations, and providing solutions and recommendations for your food project throughout the month through direct communication and remote meetings with our experts, so that you can work with the peace of mind that there is a specialized entity behind you that will guide and illuminate your path towards success, brilliance and distinction...


2300 riyals

Request service now

Share the page

Request services and quotes:

Share by: